Plant Design
May 31, 2021
-
The area per capita in the production workshop shall not be less than 2.0 square meters
-
The ground should be paved with impermeable, non-absorbent, non-toxic, non-slip materials
-
Reasonable mechanical ventilation facilities should be adopted to ensure that the airflow flows from the clean area to the unclean area.
-
The building structure and internal facilities of the filling workshop should be moisture-proof, dust-proof, and easy to clean and disinfect.
-
Doors and windows should be tight and made of non-deformable and corrosion-resistant materials.